In version 2.3 the ReqIF Recommendation got an additional workflow diagram that shows the recommended status workflow between customer and supplier during a ReqIF exchange. The detailed workflow can be found in Annex B of the recommendation.
In order to accelerate the development of complex mechatronic systems, such as those used in the automotive or aerospace industries, and to save costs, these systems are increasingly being developed using systems engineering approaches and validated virtually.
prostep ivip SmartSE Recommendation 2025 PSI 11 Smart Systems Engineering - Collaborative Simulation-Based Engineering Version 4.0
prostep ivip AI-surveyResults & Follow-up
JT-IF Implementation Guidelines for PMI in JT
prostep ivip White PaperSystems Engineering and Agile Methods
Guard Rails for “Simulation CredibilityStandards and Recommendation”
Test report for the STEP AP242 Benchmark #4 - Short Report
ReqIF Implementation Guideline referring to OMG ReqIF1.2
Challenges and Lessons Learned for Successful Implementations