Logo
  • About us
  • Project Groups
    • CPM Maintenance
    • Maintenance
    • CAx Implementor Forum
    • CPM Implementor Forum
    • ECAD Implementor Forum
    • C3I (Collaborative CAD/CAE Integration)
    • ECAD/MCAD-Collaboration
    • Engineering Change Management (ECM) Internationalization
    • Mechatronic Process Integration (MPI)
    • Internationalization of the Requirements Interchange Format (IntRIF)
    • JT Translator Benchmark
    • JT Workflow Forum
    • LOng Term ARchiving - LOTAR
    • PDM User Group
    • Process Chain Car Electric / AP 212
    • Secure Product Creation Processes (SP²)
    • Archiv
  • Services
  • Standard & Info
  • Downloads
  • Events
  • Workshops
  • News
  • Home
  • Contact
  • Sitemap
  • Glossary
  • FAQ
  • Login
deutsche Version
Deutsch
english version
english version
 

CPM Maintenance


Term

since 2008


Mission

Goal of the CPM-Recommendations (PSI 1-1, PSI 1-2) is the optimization of project management during the product creation process (PEP) in the automobile industry across company boundaries.  The focus here is on task-, time- and communication management.
Key activities are the maintenance of the CPM Recommendations, the coordination with other committees concerned with project management, and public relation activities. 


Selection of Project Management Standards for the Automobile Industry

Selecting the „right standard“ according to one’s own needs is for the user a complex process fraught with risk.  Many of the project management standards available today do have in fact the same objective, but are partly contradictory or industry specific.
Together with the German Society for Project Management (Deutschen Gesellschaft für Projektmanagement e.V. (GPM))  ProSTEP iViP wants to provide assistance in selecting from existing project management standards and using those standards in the automobile industry. This is the reason for setting up the project AutoPM.


Maintenance of Collaborative Project Management (CPM) results

Focus is placed on maintaining the two ProSTEP iViP Recommendations listed below:

No

Title

Comments

PSI 1-1

Reference Model

Version 2.0

PSI 1-2

Data Exchange Model

Version 1.0


In addition, preparations are currently being made for the internationalization of this specification.

Work is performed in close cooperation with the CPM-IF.


Products

  • see CPM Implementor Forum

Appointment

please log in

Chairman

Rolf Klamann
Continental

ProSTEP iViP Contact

Dag Plischke dag.plischke@prostep.com
Tel.: +49 89 35020-209
Fax: +49 89 35020-200

Participants

Continental AG
PROSTEP AG

 
© 2010 ProSTEP iViP e.V. | Impressum
Print to Top