Logo
  • About us
  • Project Groups
    • CPM Maintenance
    • Maintenance
    • CAx Implementor Forum
    • CPM Implementor Forum
    • ECAD Implementor Forum
    • PDM Implementor Forum
    • ECAD/MCAD-Collaboration
    • Engineering Change Management (ECM) Internationalization
    • LOng Term ARchiving - LOTAR
    • Mechatronic Process Integration (MPI)
    • PDM User Group
    • Process Chain Car Electric / AP 212
    • Secure Product Creation Processes (SP²)
    • SimPDM
    • SOA4PLM®
    • Archiv
      • Benchmark
      • Resource oriented CAD/CAM Objects (3D)
      • Collaborative Project Management (CPM)
      • Collaborative Product Visualization (CPV)
      • Digital Manufacturing
      • Engineering Change Management (ECM)
      • ECM Implementor Forum (ECM-IF)
      • PLM Services 2.0
      • Business Value Analysis of Solutions for Product Data Integration
      • Extended Product Data Integration - XPDI
  • Services
  • Standard & Info
  • Downloads
  • Events
  • Workshops
  • News
  • Home
  • Contact
  • Sitemap
  • Glossary
  • FAQ
  • Login
deutsche Version
Deutsch
english version
english version
 

Engineering Change Management (ECM)

Term

September 2002 till December 2009


Mission

Up until now, the relationship between customer and supplier was determined by predefined processes, customer guidelines and corporate standards. Today, focus is placed on project-specific, i.e. temporary, network structures, with the general aim of reducing throughput time during the creation process while at the same time increasing quality. It is therefore vital that changes are communicated to and implemented by partners from development, planning and production as promptly as possible. The objective of the Engineering Change Management (ECM) project group is therefore to develop standards-based recommendations that provide support for the ECM processes between the cooperation partners.


Milestones

  • Identification and documentation of typical interaction scenarios
  • Development of the general ECM recommendation for VDA 4965
  • Development of the recommendation for engineering change request (ECR) processes in cooperative partnerships, VDA 4965-1, and validation of VDA 4965-1 in industry-driven pilot scenarios
  • Documentation of conformity criteria, validation rules and sample applications in a usage guide for VDA4965-1 (tbd)
  • Development of the recommendation for engineering change order (ECO) processes in cooperative partnerships, VDA 4965-2, and validation of VDA 4965-2 in industry-driven pilot scenarios (tbd)
  • International cooperation and harmonization activities with other bodies (e.g. SASIG) and projects (e.g. PLM Services)

Appointment

please log in

Chairman

Jürgen Scharpf
Daimler AG

ProSTEP iViP Contact

Dr. Manfred Fischer manfred.fischer@prostep.com
Tel.: +49 30 63 926-035
Fax: +49 6151 9287-326

Participants

Audi AG
Behr GmbH & Co. KG
BMW AG
Daimler AG
Delphi Deutschland GmbH
IBM Deutschland GmbH
PDTec GmbH
PROSTEP AG
Siemens AG
SupplyOn AG
T-Systems Enterprise Services GmbH
Unity AG
Universität St. Gallen (IWI-HSG)
Valmet Automotive Inc.
VDA - Verband der Automobilindustrie e. V.
ZF Friedrichshafen AG

 
© 2008 ProSTEP iViP e.V. | Impressum
Print to Top