
Schedule
09:00 | Registration | |||
10:00 | Welcome | |||
10:15 | Bette Walker, Vice President & CIO, Delphi Corp. | |||
10:45 | Eric Sterling, Vice President Automotive Industry Marketing, UGS | |||
11:15 | Dr. Trac Tang, Konzern Process Integration Officer Produktprozess, Volkswagen AG | |||
11:45 | Lunch Break | |||
| TRACK 1 | TRACK 2 | Workshops | |
13:00 | Engineering Change Management: Partner Process Re-engineering based on VDA 4965-1 | Document Management and Collaboration between OEM and Supplier - the Requirements Specification Process | Workshop 1: Collaboration Platforms to Support Cross-partner Development Networks
| Workshop 2: Functional DMU - Requirements and Objectives Regarding Integration, Simulation and Visualization |
13:30 | Benefit of | Challenges of Requirements Modelling in the Product Development Process | ||
14:00 | State-of-the-Art Change Management - Requirements and Solutions | Integration of Electrical System Development Processes with the Wiring Harness List (KBL) | ||
14:30 | Coffee Break | |||
| TRACK 3 | TRACK 4 | TRACK 5 | Workshop |
15:00 | Protecting a Company's Intellectual Property in the Extended Enterprise | Integrating Companies, Processes and Systems by Using Geometric Part Analysis | Carry Over Concept: Parametric-Associative Body in White Development - Integral with Styling and PDM/PLM | Workshop 3: Engineering Change Management - Realizing VDA 4965-1 |
15:30 | Integrating Knowledge-based Engineering and PLM - Focus on Innovation | Advanced Product Quality Planning as a Focal Point of the Product Evolution Process | ||
16:00 | Risks at Sharing Intellectual Property in Partner Networks and Protection for 3D Engineering | PDM-based Integration of Mechanical and Electrical Product Development | Solutions with Intelligent Documents | |
16:30 | Coffee Break | |||
17:00 | Prof. Dr. Hartmut Esslinger, Co-CEO, frog design inc. | |||
17:30 | Evening Event | |||